Reports/ Presentations
Design and Construction Report
A Design and Construction Report (DCR) has been prepared for the project and is available for a 30-day comment period from February 14, 2022 to March 15, 2022.
Please submit any questions or comments you may have by March 15, 2022 through the Contact Us page.
The DCR is available via the following links:
Design and Construction Report
Appendix A - Notification Materials
Appendix B - PIC Summary Report
Appendix C - Comments Received
Appendix D - General Arrangement Drawings
Appendix E - Noise Assessment Report
Appendix F - Terrestrial Ecosystems Existing Conditions and Impact Assessment Report
Appendix G - Fish and Fish Habitat Existing Conditions and Impact Assessment Report
Appendix H - Stage 1 Archaeological Assessment
A Design and Construction Report (DCR) has been prepared for the project and is available for a 30-day comment period from February 14, 2022 to March 15, 2022.
Please submit any questions or comments you may have by March 15, 2022 through the Contact Us page.
The DCR is available via the following links:
Design and Construction Report
Appendix A - Notification Materials
Appendix B - PIC Summary Report
Appendix C - Comments Received
Appendix D - General Arrangement Drawings
Appendix E - Noise Assessment Report
Appendix F - Terrestrial Ecosystems Existing Conditions and Impact Assessment Report
Appendix G - Fish and Fish Habitat Existing Conditions and Impact Assessment Report
Appendix H - Stage 1 Archaeological Assessment
Online Public Information Centre
An online Public Information Centre was held for the project from Monday, December 6, 2021 to Monday, December 20, 2021.
To download the Public Information Centre display materials for optimal resolution or offline viewing, please click here.